Environmental Assessments
BMR Jamaica Wind Ltd.
-For the proposed 34 MW Wind Farm at Munro, St. Elizabeth, Jamaica (2014)
Rivva Riddim
-For a proposed ecotourism park located in St. Mary and St. Ann adjacent to the White River (2013)
Clean Alternative Energy Ltd. (CAEL)
-For a 24MW Wind Farm in Manchester ( 2013)
Jamaica Public Service Company Ltd.
-For the 6 MW expansion of the Maggotty Hydropower plant in St. Elizabeth (2011)
-For the establishment of 3 MW Wind Turbines in St. Elizabeth (2010)
Ministry of Local Government and Community Development
-For Minor Water Supplies to be constructed and upgraded throughout Jamaica under EU/ACP Water Facility Infrastructure Programme (2005)
EAST Programme/USAID
-University Hospital of the West Indies- Proposed incinerator to replace their existing unit (2004)
Studio Ing. G. Pietrangeli S.r.l.
-Feasibility ESIA of Six Potential Hydropower Sites in Jamaica proposed for development by the Petroleum Corporation of Jamaica ( 2017)
-Pre-feasibility ESIA of Six Potential Hydropower Sites in Jamaica proposed for development by the Petroleum Corporation of Jamaica (2015)
Windalco
-EIA and SIA for the proposed coal fired power plant and calciner at Ewarton and coal receival and storage facilities at Port Esquivel (2016)
Inter-American Development Bank (IDB)
-Environmental and Social Assessment Report for proposed projects to be undertaken by the National Water Commission (NWC) to rehabilitate water infrastructure within the Kingston Metropolitan Area and some rural towns including the establishment of an aquifer recharge system in St. Catherine (2011)
National Water Commission
-Subcontracted to Studio Pietrangeli to prepare a Rapid Environmental and Social Assessment, Vulnerability Assessment and Emergency Preparedness and Response Plan for proposed upgrading of the Hermitage Reservoir in St. Andrew, Jamaica
Jamaica Public Service Company Ltd.
-Rapid EIA for the 480 MW Generation Expansion proposed for Old Harbour Bay, St. Catherine (2011)
-Rapid Environmental Assessment for potential hydropower and wind power sites being considered by the Jamaica Public Service Company in a bid to provide alternative energy for Jamaica. Two hydropower sites, Great River, St. James/Hanover and Maggotty St. Elizabeth were reviewed as well as three wind power sites at Palisadoes, Munroe and Hellshire (2008)
BMR Energy LLC
-Initial Environmental Assessment for the proposed further expansion of the 34 MW Wind Farm in in Munro, St. Elizabeth, Jamaica by an additional 9.9 MW (2016)
Tamarind Energy Ltd
-Initial Environmental Assessment for the proposed 36.3 MW Wind Farm in French Park, Manchester, Jamaica to accompany the bid in response to the RFP issued by the Office of Utilities Regulation (OUR) dated July 31, 2015 for the supply of up to 37 MW (Net) of Electricity Generation from Renewable Energy Resources on a Build, Own and Operate (BOO) Basis (2016).
Windalco
-Environmental Assessment of the area around the Ewarton Bauxite Plant in St. Catherine including flora and fauna assessment, sediment analyses and water quality assessment to assess the impacts of a spill in July 2011 (Jul-Dec 2011)
-Environmental Assessment of the area around the Ewarton Bauxite Plant in St. Catherine including flora and fauna assessment, sediment analyses and water quality assessment ( Dec 2010- May 2011)
Oakridge Power LLC
-Initial Environmental Assessment for the proposed expansion of the 3MW JPS Wind Farm at Munro, St. Elizabeth, Jamaica by 34-42 MW of additional wind power to accompany the bid in response to the RFP issued by the GOJ for the supply of up to 115 MW of Electricity Generation Capacity from Renewable Energy Based Power Generation facilities on a BOO Basis (2013)
Nippon Koei Co., Ltd. (Japan)
-Environmental Assessment for the Feasibility Study for the Great River Hydro Power Project in (Hanover/St. James) Jamaica (2010)
North Star Development Jamaica Ltd.
-For a 10 MW Utility-Scale Solar Project in Hill Run, St. Catherine, Jamaica; and for a 25MW Utility-Scale Solar Project in Spicy Hill, Trelawny, Jamaica (May 2013)
SunEdison Spain Construction SLU
-For the development of a solar farm with a generating power capacity of 50 MW in Westmoreland, Jamaica (May 2013)
Armourview Holdings Ltd.
–For a proposed 25MW Utility-Scale Solar Project in Mango Valley, St. Mary, Jamaica (May 2013)